Pressure Relief Valve for Transformers

Model NO.: YSF4II
Working Temperature: Medium Temperature (120°C<T<450°C)
Material of Seal Surface: Soft Sealed
Valve Body: Sheet Metal
Application: Industrial Usage, Water Industrial Usage, Household Usage
Valve Usage: with Transformer Oil Tank
Trademark: CNVILLE
Transport Package: Wooden Case or as Per Requirement
Specification: ISO 9001: 2000
Origin: Ningbo China
HS Code: 85
Model NO.: YSF4II
Working Temperature: Medium Temperature (120°C<T<450°C)
Material of Seal Surface: Soft Sealed
Valve Body: Sheet Metal
Application: Industrial Usage, Water Industrial Usage, Household Usage
Valve Usage: with Transformer Oil Tank
Trademark: CNVILLE
Transport Package: Wooden Case or as Per Requirement
Specification: ISO 9001: 2000
Origin: Ningbo China
HS Code: 85
Application
The products that coupled with electrical alarm signal realize remote control.
The products are apt for electrical equipments such as gas or liquid insulate transformer, instrument transformers,
on-load-tap channel switch, high voltage switch etc.
Once there's something wrong in such electrical equipments, valve open and relieve the pressure to avoid oil basin
from metamorphose and blowout.
With the pressure reduced the valve automatically closed to prevent water and impurity got in from outside.

Working conditions and install mode:

Environment temperature - 30º C~40º C

Installation site
A) Install in the oil basin to cover
B) Install in the oil basin to sidepiece upside
C) Install in lift pedestal Alarm and Enviroment
Install, Using, Debugging Install: Pressure releasing valve and tank connect with the stud bolt

Attention:
1) The bottom of pressure releasing valve assemble to seal well;
2) When connect the pressure releasing valve and tank, tighten the bolts equality, avoid that valve pedestal rupture.
L Using: With latching that must be removed before equipment circulate;
Insure the normal work of the pressure releases valve.
L Debugging: Electric alarm switch, should manual debug deferent signal of switch whether exactitude, sensitive, before the equipments circulate.
L Method:
1)Measure export signal of switch when pressure releasing valve action less by multimeter to see whether in accordance with the signal mark of the switch.
Viz.: (a) "Common" towards "Normal open" normal open
       (b) "Common" towards "Normal closed" normal closed.
2)Experiment of simulate releasing valve's action, checkout whether inching switch accurate export behavioral signal. Method: Raise the small red hat of the pressure releasing valve, then releasing valve turn on, check whether the switch measure of the electric signal change.
Viz.:
(a)"Common" of switch towards "Normal open": "Normal open" should turn to "Normal closed"
(b)"Common" of switch towards "Normal closed": "Normal closed" should turn to "Normal open";
(c)Examine the signal switch and control circuit connect whether right and good.
L Attention: The small red hat must be replacement after test over, insure that the pressure releasing valve normal working and warning.
 Caliber of oil-gushing  D1   D2  D3  D4  H1  H  Valve pedestal install bolt Diameter × quantity 
 φ25  φ46  φ54  φ90  φ120  50  114  M10×3 
 φ50   φ74  φ83.5  φ130  125×125  50  114  M12×4
 φ80  φ122  φ133  φ170  φ200  50  128  M12×6
 φ130  φ172  φ181  φ235  φ260  50  128  M16×6
Pressure Relief Valve for TransformersPressure Relief Valve for TransformersPressure Relief Valve for Transformers
Our Best Service For You
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan,and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testinng.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months gurantee period normally.


Welcome to contact with us:
Pressure Relief Valve for Transformers Application
The products that coupled with electrical alarm signal realize remote control.
The products are apt for electrical equipments such as gas or liquid insulate transformer, instrument transformers,
on-load-tap channel switch, high voltage switch etc.
Once there's something wrong in such electrical equipments, valve open and relieve the pressure to avoid oil basin
from metamorphose and blowout.
With the pressure reduced the valve automatically closed to prevent water and impurity got in from outside.

Working conditions and install mode:

Environment temperature - 30º C~40º C

Installation site
A) Install in the oil basin to cover
B) Install in the oil basin to sidepiece upside
C) Install in lift pedestal Alarm and Enviroment
Install, Using, Debugging Install: Pressure releasing valve and tank connect with the stud bolt

Attention:
1) The bottom of pressure releasing valve assemble to seal well;
2) When connect the pressure releasing valve and tank, tighten the bolts equality, avoid that valve pedestal rupture.
L Using: With latching that must be removed before equipment circulate;
Insure the normal work of the pressure releases valve.
L Debugging: Electric alarm switch, should manual debug deferent signal of switch whether exactitude, sensitive, before the equipments circulate.
L Method:
1)Measure export signal of switch when pressure releasing valve action less by multimeter to see whether in accordance with the signal mark of the switch.
Viz.: (a) "Common" towards "Normal open" normal open
       (b) "Common" towards "Normal closed" normal closed.
2)Experiment of simulate releasing valve's action, checkout whether inching switch accurate export behavioral signal. Method: Raise the small red hat of the pressure releasing valve, then releasing valve turn on, check whether the switch measure of the electric signal change.
Viz.:
(a)"Common" of switch towards "Normal open": "Normal open" should turn to "Normal closed"
(b)"Common" of switch towards "Normal closed": "Normal closed" should turn to "Normal open";
(c)Examine the signal switch and control circuit connect whether right and good.
L Attention: The small red hat must be replacement after test over, insure that the pressure releasing valve normal working and warning.
 Caliber of oil-gushing  D1   D2  D3  D4  H1  H  Valve pedestal install bolt Diameter × quantity 
 φ25  φ46  φ54  φ90  φ120  50  114  M10×3 
 φ50   φ74  φ83.5  φ130  125×125  50  114  M12×4
 φ80  φ122  φ133  φ170  φ200  50  128  M12×6
 φ130  φ172  φ181  φ235  φ260  50  128  M16×6
Pressure Relief Valve for TransformersPressure Relief Valve for TransformersPressure Relief Valve for Transformers
Our Best Service For You
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan,and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testinng.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months gurantee period normally.


Welcome to contact with us:
Pressure Relief Valve for Transformers